A warehouse is one of the most common uses of a PEB shed (Pre-Engineered Building), and also one of the easiest to get slightly wrong. The shed that looked fine on paper turns out too low for the racking, too hot in summer, or too tight for trucks to turn.
Most of these problems are decided in the first few weeks, before steel is ordered. This checklist covers the 12 things to settle before you ask manufacturers for quotes. For the general design process, see our PEB shed design guide.
1. What Will You Store, and How?
Everything else follows from this. Write down:
- Type of goods (palletised, loose, bulk, heavy, light)
- Storage method: floor stacking, pallet racking, drive-in racking or shelving
- Peak stock volume today and in three to five years
A warehouse for loose bagged goods and one for tall pallet racking are very different buildings, even if the floor area is the same.
2. Clear Height
Clear height is the usable height under the lowest obstruction, not the eave height. Work it out from your tallest rack or stack, plus clearance for the forklift mast, lighting, sprinklers and roof structure. Adding height later is difficult, so decide it carefully. Remember that taller walls also mean more steel and more cladding.
3. Clear Span and Column Positions
Columns in the middle of a warehouse take up floor space and block forklift movement. PEB frames can cover wide spans, but wider spans cost more steel. Match column spacing to your rack layout so the columns fall between racks rather than in aisles.
4. Floor Area and Layout
Plan the layout on paper first:
- Storage zone
- Receiving and dispatch areas
- Aisles and turning space
- Office, workshop and packing zones, if needed
Include room to extend the building later in the same direction as the structure, and mention expansion to the manufacturer at the design stage.
5. Loading Doors and Docks
Think about the trucks that will use the building:
- Number of doors, and whether you need them on one side or two
- Door width and height for your vehicles
- Dock height, if trucks are loaded from a platform
- Canopy or cover over the loading area for rain protection
Large openings affect wall framing and bracing, so settle them early.
6. Floor Slab and Foundation
The floor takes constant forklift traffic and the point loads from racking legs. Give your civil engineer the rack layout and loads so the slab and foundation are designed for them. Floor flatness can matter a lot where forklifts operate at height, so discuss it with your civil contractor. The steel and the foundation must be coordinated, particularly the anchor-bolt layout.
7. Roof Heat and Insulation
An uninsulated metal roof gets very hot in a Pakistani summer, and that heat radiates down onto the goods and staff. Options include:
- Insulated sandwich panels on the roof
- Roof ventilators and ridge vents
- Translucent sheets only where daylight is needed, since they also let in heat
If your goods are temperature-sensitive, insulation is worth planning from the start. Read our guides on sandwich panels for PEB sheds and panel thickness.
8. Ventilation and Daylight
Good airflow keeps the space comfortable and helps protect stock from damp and heat build-up. Plan louvres, ridge ventilators and window positions together with the layout. Daylight through roof sheets reduces lighting needs during the day.
9. Fire Safety and Services
Sprinklers, alarms, extinguishers, emergency exits and lighting need to be planned, not added after the fact. Hanging services from the roof frame adds load, so tell the structural designer what you plan to install. Follow the fire safety requirements that apply to your site and use, and confirm them with the relevant authority or a qualified consultant.
10. Wind, Seismic and Site Loads
The structural design should follow the wind and seismic loads for your location. Ask the manufacturer which design standards they use and to state their assumptions in writing. If you plan solar panels on the roof, include that extra load in the design.
11. Access and Site Logistics
Check the practical side:
- Truck access and turning space on the plot
- Where materials and cranes will be placed during erection
- Local truck timing restrictions for delivery of long members
12. Scope and Quotation
Make sure every quote covers the same scope. Ask what is included:
- Steel structure and cladding
- Doors, windows, ventilators and gutters
- Installation and erection
- Foundation and civil work
- Insulation
- Transport
Two quotes can be very different simply because one leaves items out. For a breakdown of what drives price, read PEB shed cost per square foot in Pakistan and warehouse shed cost in Lahore.
Quick Checklist Table
| # | Decision | Ask yourself |
|---|---|---|
| 1 | Storage method | What goods, and racked or floor-stacked? |
| 2 | Clear height | Tallest stack plus clearances? |
| 3 | Span and columns | Do columns fall between racks? |
| 4 | Layout | Zones, aisles, expansion room? |
| 5 | Doors and docks | Number, size, truck type? |
| 6 | Floor and foundation | Rack and forklift loads given to civil engineer? |
| 7 | Roof insulation | Is heat a problem for goods or staff? |
| 8 | Ventilation and light | Louvres, ridge vents, daylight? |
| 9 | Fire and services | Sprinklers, alarms, exits planned? |
| 10 | Loads | Wind, seismic, solar, services stated? |
| 11 | Site logistics | Truck access and erection space? |
| 12 | Scope | Are quotes like for like? |
Common Warehouse Mistakes
- Choosing eave height without checking the real rack height
- Leaving columns in the aisles
- Forgetting insulation and ventilation until summer arrives
- Not telling the designer about solar, sprinklers or mezzanine plans
- Comparing quotes with different scopes
- Not planning space for expansion